A business landmark on the Victoria Harbour skyline — HENGSHENG MARBLE S&T CO. LIMITED Stone delivered 42,000 ㎡ of commercial space through a digital supply chain, integrated end to end.

The project is designed as a "vertical city": the office lobby takes a 12-metre double-height ceremonial feature wall of Calacatta Gold, the typical-floor corridors extend visual depth with Carrara White, and the retail atrium and lift lobbies set a premium commercial tone with Nero Marquina — one floor, one stone, an order that gives 68 storeys of office space unity with layering.
HENGSHENG MARBLE S&T CO. LIMITED Stone handled design detailing, factory fabrication and on-site installation for all stone: 42,000 ㎡ of finished stone, 126 round columns and over 30,000 wall and floor pieces, all digitally pre-laid, with a night-shift staggered construction system delivering "open for business while we build" with zero disturbance.
Three principal stones run through 68 storeys of business space, balancing corporate image, wear resistance and whole-life maintenance cost.



All 14 photographs are as-built records of the completed areas. Click any image to view the stone details enlarged.














A six-stage record from survey to handover — every step with its own data standards and signed accountability.

3D laser scanning covered 68 floors and 6 public areas; point clouds overlaid on BIM resolved 312 structural deviations in advance.

Every slab scanned, numbered and virtually pre-assembled in the factory, with piece-by-piece installation drawings and night-shift deliveries direct to floor.

Five-axis CNC machined the curved panels for 126 round columns and over 30,000 wall and floor pieces to a tolerance of ±0.5 mm.

Packed floor by floor in reverse installation order with shock-absorbing lining; a 40-minute night run to site with zero breakage.

Vacuum-lift hoisting combined with laser projection, working nights and weekends — "open for business while we build", zero disturbance.

Public areas ground and crystallised as one: flatness ±1.2 mm, gloss above 92°, LEED material certification.
Craft standards up close — the millimetre-level rigour behind premium business space.

Underbolt dry-hanging with three-way adjustable 304 stainless clamps; all concealed works passed third-party structural review.

1,600 mm slab flooring laid with levelling clips to joints under 1.0 mm, suited to the mall's heavy foot traffic.

The retail atrium's 12 m medallion comprises 1,842 pieces cut to 0.1 mm accuracy; approved as a full pre-assembly before dispatch.

Quarter-circle curved panels calibrated one by one with a temporary positioning ring; joint deviation ≤0.3 mm across all 32 lift-lobby wraps.

Book-matched joints tinted with color-matched epoxy; after arris polishing the gloss matches the slab face — the brand wall reads as one piece.

Public-area stone siliconised and crystallised to grade 5 stain resistance, cutting annual maintenance cost by 45% under heavy traffic.
Building works inside a live 68-storey tower — HENGSHENG MARBLE S&T CO. LIMITED Stone answers with data.
Wind sway and thermal movement compound in a high-rise, and heavily used public floors across 68 storeys easily wave and debond.
The tower was partly occupied; stone deliveries and installation could not disturb the working day, and logistics windows were tiny.
Office, retail and dining uses meet at many interfaces; stone junctions with metal, glass and joinery are complex.
The atrium and dining areas see 60,000+ visits a day; slip resistance and wear resistance directly affect safety and operations.
Whatever the scale of your project, our engineering consultants will tailor the optimal stone solution for you — from material selection through to handover, with one-to-one service throughout.
Thank you for your enquiry. Our engineering consultant will contact you within 24 hours.
Browse more project case studies and discover HENGSHENG MARBLE S&T CO. LIMITED's excellence across every building type.